Current SolutionsINFRARED INSPECTION
REPORT
ReportT-2026-014InspectedNovember 12, 2026InspectorLevel I Certified ThermographerCameraCalibrated infrared camera
Prepared for
Harbor Point PropertiesHarbor Point Clinic, 1450 Harbor Point Drive, Denver, CO
Conditions at the time of the inspection
Ambient 72 °F · Normal operating load · Emissivity 0.95 · Enclosures opened by a qualified electrician
Summary
Serious1
Intermediate1
Minor1 14 panels and 6 disconnects inspected
| # | Equipment | Rise | Severity |
|---|
| 1 | LP-1, breaker 5 line-side lug | +92 °F | Serious |
| 2 | MDP, phase B bus connection | +31 °F | Intermediate |
| 3 | RTU-1 disconnect, load side | +12 °F | Minor |
Current Solutions · Infrared inspection reportPage 1 of 4
FINDING 1 OF 3
Panel LP-1Level 1 electrical room · Breaker 5, line-side lug · 3-pole, 40 A
| Point | Temperature | Rise over reference |
|---|
| Sp1 | 164 °F | +92 °F |
| Reference | 72 °F | Same lug, phases A and B |
LP-1, breaker 5 line-side lugSerious Priority 2: repair as soon as possible
Phase C lug is 92 °F hotter than the same lug on phases A and B under the same load.
Recommended action De-energize, inspect and re-torque the termination to the manufacturer's value; replace the breaker if the lug is damaged. Scan again after the repair.
Current Solutions · Infrared inspection reportPage 2 of 4
FINDING 2 OF 3
Panel MDPMain electrical room · Phase B bus connection
MDP, phase B bus connectionIntermediate Priority 3: repair at the next scheduled maintenance
Recommended action Inspect and clean the connection; check torque. Scan again after the repair.
Current Solutions · Infrared inspection reportPage 3 of 4